• BodePlotHole@lemmy.world
    link
    fedilink
    arrow-up
    1
    ·
    3 days ago

    I do MEP design for commercial buildings in the US. If a job ever shows “EWC”, I don’t ask for specs, I assume the EZH2O until either the job goes out with that spec, or the client directly refuses to use that model.

    Anything less, is uncivilized.